Building for Hermanos de la Cruz Blanca in Huesca

Hotels - Residences

INGENIERÍA TORNÉ S.L. Carried out the projects and oversaw all the installations for the Building for the Brothers of the White Cross (Huesca), configured with a Residence of 80 rooms, a Day Center, and a Multipurpose Hall, with an approximate total area of 5,400 m2. The construction period was between 2006-2007.

A distinctive feature of this building is that it was realized through subsidies from certain public entities and donations from other non-public agents and volunteers.

The idea of the center is to carry out significant humanitarian work, with the Brothers of the White Cross and numerous volunteers working with people with various problems, seeking their reintegration into society by establishing essential human values.

Building for Hermanos de la Cruz Blanca in Huesca
Promoters
HERMANOS DE LA CRUZ BLANCA
Typology
Residencias / Centros de Día
Situation
Huesca
Useful surface (m2)
5.400
Building typology
Sótano + Baja + 3
P.E.M. (€)
6.500.000
Year (s) work
2006-2007
HERMANOS DE LA CRUZ BLANCA

The building has the following main uses:

Main building for Residence:

It has three floors dedicated to the residence of people with problems.

Residence Building for the Brothers of the White Cross:

Located on the 1st floor of the North building above the day center.

Day Center:

Located on the ground floor with numerous lounges, dining rooms, and offices.

Multipurpose Hall:

Where various activities such as masses, gymnastics, or sports activities can be carried out.

Basement of the main building:

Where technical rooms, laundry, kitchen, dressing rooms, and other uses are located.

Rooftop:

With the location of installations.

The implemented facilities are as follows:

  • Air Conditioning
  • Ventilation
  • Medium Voltage and Transformer Center
  • Low Voltage Electricity
  • Natural Gas
  • Telecommunications and Related Services
  • Fire Protection
  • Solar Thermal Energy
  • Plumbing and Hot Water
  • Sanitation
  • Comprehensive Facilities Management
  • Management of the Building's Environmental Activity License

The total budget for the installations amounted to 1,945,600.00 Euros.